Hydro-Generation / Water Conveyance

Kerckhoff Dam Low-Level Outlet Gate Replacement

Project

Back

Working on, in, and around water

During a dive inspection of the three 6-foot diameter Low-Level Outlet (LLO) gates on Kerckhoff Dam, substantial leakage was discovered, along with extremely high corrosion. Syblon Reid was awarded the contract to rehabilitate the LLO’s. The scope of work included dredging the accumulated silt on the upstream side of the dam, demolishing and replacing the existing steel LLO components, and removing and replacing the existing LLO sluice gates, actuators, and pedestals.

  • Location

    Kerckhoff Lake, Auberry, CA

  • Market

    Hydro-Generation / Water Conveyance

  • Services

    Heavy Civil Mechanical

    Marine Work

Facts & figures

Facts & Figures

800 +

cubic yards of dredged material

Next Project

Oroville Dam Spillway Emergency Response